Requirements for the Ratification/Recognition of the certificates of a的中文翻譯

Requirements for the Ratification/R

Requirements for the Ratification/Recognition of the certificates of approval for models of water and electricity meters.

Steps to follow:
1. The process starts by submitting the service request to the INTN (see request template in Annex A) along with 4 (four) samples of the meter for which the Ratification/Recognition and the documents related to it. (Requirements for the Ratification/Recognition are detailed in Annex B)
2. In case any additional information or clarification related to the information in the request is required, the requestor will be notified via e-mail, no more than three working days afterwards.
3. The requestor has 20 working days to provide the information requested so that evaluation can start. If the requestor fails to deliver the requested information, the process will be determined to be finalized and all provided information will be returned.
4. The certificate of Ratification/Recognition will be issued in a period of 20 working days from the date the requestor has paid for the ratification service, with priority given to those requestors that have requested the service and paid the fee, and following the numbers of the files open for each case and requestor, respectively.
5. That mentioned in the previous item will take place whenever the documentations and other requirements for the ratification are complete and in agreement with the equipment presented as sample. Otherwise, the requestor will be informed of the missing points through a note signed by the chief of the department of model approval, or by the person in charge of dispatch of that department if the chief is not available.
6. In case the client wishes to request a complementary certificate of a meter already previously ratified/recognized, he must provide all back up documents on which the equipment information of the previously ratified/recognized equipment are indicated and the differences that exist in relation to the meter they wish to ratify/recognize, besides the related samples for revision.
Note: The complementary certificate will be issued only if the differences between the parameters of the meter don’t alter the measurement characteristics of the meter initially ratified/recognized, and this has been proven by the laboratory technician involved in the revision.


0/5000
原始語言: -
目標語言: -
結果 (中文) 1: [復制]
復制成功!
Requirements for the Ratification/Recognition of the certificates of approval for models of water and electricity meters.Steps to follow:1. The process starts by submitting the service request to the INTN (see request template in Annex A) along with 4 (four) samples of the meter for which the Ratification/Recognition and the documents related to it. (Requirements for the Ratification/Recognition are detailed in Annex B)2. In case any additional information or clarification related to the information in the request is required, the requestor will be notified via e-mail, no more than three working days afterwards.3. The requestor has 20 working days to provide the information requested so that evaluation can start. If the requestor fails to deliver the requested information, the process will be determined to be finalized and all provided information will be returned.4. The certificate of Ratification/Recognition will be issued in a period of 20 working days from the date the requestor has paid for the ratification service, with priority given to those requestors that have requested the service and paid the fee, and following the numbers of the files open for each case and requestor, respectively.5. That mentioned in the previous item will take place whenever the documentations and other requirements for the ratification are complete and in agreement with the equipment presented as sample. Otherwise, the requestor will be informed of the missing points through a note signed by the chief of the department of model approval, or by the person in charge of dispatch of that department if the chief is not available. 6. In case the client wishes to request a complementary certificate of a meter already previously ratified/recognized, he must provide all back up documents on which the equipment information of the previously ratified/recognized equipment are indicated and the differences that exist in relation to the meter they wish to ratify/recognize, besides the related samples for revision.Note: The complementary certificate will be issued only if the differences between the parameters of the meter don’t alter the measurement characteristics of the meter initially ratified/recognized, and this has been proven by the laboratory technician involved in the revision.
正在翻譯中..
結果 (中文) 3:[復制]
復制成功!

水和电能表的批准/认可证书的要求。
遵循步骤:
1。这个过程开始提交服务请求的意图(见请求模板在附件A)和4(四)例表的批准/识别和相关文件了。(批准/认可的要求详见附件二)
2。如果任何额外的信息或请求中的信息相关的澄清是必需的,申请者会收到电子邮件通知,不超过三个工作日之后。
3。申请者有20个工作日内提供所需资料,评价可以开始。如果申请人未能提供所要求的信息,这个过程会决定定稿,所有提供的信息将被退回。
4。的批准/认可证书将在为期20个工作日申请已批准支付服务的发布,给那些请求所要求的服务和付费优先,和下面的每一种情况下,请求的文件打开数,分别。
5。在前一项将在文件和批准的其他要求是完整的,与作为样本的设备协议。否则,请求将被告知的缺失点的模型通过审批部门首席签注,或被人在那个部门派遣负责如果总不可用。
6。如果客户希望提供一个先前已批准/确认的计量表的补充证书,他必须提供所有先前已批准/认可设备的设备信息,并注明他们希望批准/识别的表中存在的差异,以及修改相关的样品。
注:只有当表的参数之间的差异并没有改变初步批准/确认的测量特性之间的差异时,才可以发出补充证书,这已被实验室技术人员在修订过程中证明。
正在翻譯中..
 
其它語言
本翻譯工具支援: 世界語, 中文, 丹麥文, 亞塞拜然文, 亞美尼亞文, 伊博文, 俄文, 保加利亞文, 信德文, 偵測語言, 優魯巴文, 克林貢語, 克羅埃西亞文, 冰島文, 加泰羅尼亞文, 加里西亞文, 匈牙利文, 南非柯薩文, 南非祖魯文, 卡納達文, 印尼巽他文, 印尼文, 印度古哈拉地文, 印度文, 吉爾吉斯文, 哈薩克文, 喬治亞文, 土庫曼文, 土耳其文, 塔吉克文, 塞爾維亞文, 夏威夷文, 奇切瓦文, 威爾斯文, 孟加拉文, 宿霧文, 寮文, 尼泊爾文, 巴斯克文, 布爾文, 希伯來文, 希臘文, 帕施圖文, 庫德文, 弗利然文, 德文, 意第緒文, 愛沙尼亞文, 愛爾蘭文, 拉丁文, 拉脫維亞文, 挪威文, 捷克文, 斯洛伐克文, 斯洛維尼亞文, 斯瓦希里文, 旁遮普文, 日文, 歐利亞文 (奧里雅文), 毛利文, 法文, 波士尼亞文, 波斯文, 波蘭文, 泰文, 泰盧固文, 泰米爾文, 海地克里奧文, 烏克蘭文, 烏爾都文, 烏茲別克文, 爪哇文, 瑞典文, 瑟索托文, 白俄羅斯文, 盧安達文, 盧森堡文, 科西嘉文, 立陶宛文, 索馬里文, 紹納文, 維吾爾文, 緬甸文, 繁體中文, 羅馬尼亞文, 義大利文, 芬蘭文, 苗文, 英文, 荷蘭文, 菲律賓文, 葡萄牙文, 蒙古文, 薩摩亞文, 蘇格蘭的蓋爾文, 西班牙文, 豪沙文, 越南文, 錫蘭文, 阿姆哈拉文, 阿拉伯文, 阿爾巴尼亞文, 韃靼文, 韓文, 馬來文, 馬其頓文, 馬拉加斯文, 馬拉地文, 馬拉雅拉姆文, 馬耳他文, 高棉文, 等語言的翻譯.

Copyright ©2024 I Love Translation. All reserved.

E-mail: