Preliminary design of combined average maximum rainfall in liuzhou city, this design with flat grate gullies, 40m, on both sides of non-motorway side under the edge of the green belt and the laying of a 80cm diameter storm sewer, pipeline road longitudinal slope and slope, every 40m checks. Location as described in the road standard cross section of integrated planning.