The discharge system of the project applies sewage water and rainwater separate system.
The fresh water used for the project production is all used for internal recycling, no draining to outside
After septic tank treatment, domestic sewage and fecal sewage is drained to factory domestic sewage treatment station by gravity drainage. After buried sewage treatment, drain it back to the factory backwater pipe when it reaches the standards, no draining to outside