1) Turn on the machine power button.
2) Make sure the compressed air pressure available to the machine.
3) This is the automated process no need any manual interface.
4) Turn on key will help to run for the automatic function.
5) Pump, blower conveyor only equipment involve in this system.
6) Monitor the peroxide tank every cycle should not be any leak.
7) Dosing tank level need to monitor every cycle time.
8) Discharge pump will use to discharge the waste water.