Specification:
1. Cement:CPA-42.5,50KG/Bag
2. Water:water truck(6-8m³),water tank:3(capacity is 3000L)
3. Tool:shovel wheelbarrow:10(capacity is 80L),mixer:2 for 55m(4 HP 5 Tons),
3 for 75m(4 HP 5 Tons),vibratos:3,labour:50
4. Time:8:00AM-18:00PM within 1 day
5. Concrete curve test:6 PCS
6. Mix Proportion:1m³=8 bag cement + 8 wheelbarrow sand + 8 wheelbarrow
gravel + 8 wheelbarrow water