b.After reactor make-up water pump and make-up water pump are started up, SBR-V325A.B should be opened and adjusted opening degree in the local to control pump outlet pressure at 0.795 MPa. SBR-V340A.B should be opened and adjusted opening degree in the local to control pump outlet pressure at 0.85 MPa.