Greystock included in the first year of his forecast preliminary engineering costs of GBP500,000 spent over the preceding nine months on efficiency and design studies of the renovation.
Greystock included in the first year of his forecast preliminary engineering costs of GBP500,000 spent over the preceding nine months on efficiency and design studies of the renovation.