Try marked slope mainly in "control points" on the Profile, based on technologies and standards, alignment with intent, taking into account the economic points and control points, as well as the terrain changes, longitudinal design line that the initial period of work. Test points can be summed up as "front to take care of, to point to the line, repeatedly compared to line intersection," a few words.
Slope before and after before and after care that is holistic consideration cannot be limited to a certain period on the slopes. To points set line is according to longitudinal surface technology standard of requirements, meet "points", reference "economic points", preliminary set out slope line, then with triangle Board push parallel of approach, mobile slope line, repeatedly try slope, on various may of slope line programme for compared, last determine both meet standard, and guarantee points requirements, and earthwork volume most province of slope line, will its extended surrendered variable slope points preliminary location.
Provoni shpatin shënuar kryesisht në "pikat e kontrollit" në profil, në bazë të teknologjive dhe standardeve, përafrimin me qëllim, duke marrë parasysh pikat ekonomike dhe pikat e kontrollit, si dhe ndryshimet e terrenit, linjë gjatësore projektimit që periudha fillestare e punës. Pikat Test mund të përmblidhet si "para për të marrë kujdesin e, për pikë në vijën e, në mënyrë të përsëritur në krahasim me linjë ndërprerje," me pak fjalë.
Shpat para dhe pas para dhe pas kujdesit që është konsideratë holistike nuk mund të kufizohet në një periudhë të caktuar në shpatet. Në pika të caktuara linjë është në përputhje me standardin gjatësore teknologjisë sipërfaqe të kërkesave, takohen "pikat", referencë "pikat ekonomike", paraprake të vendosur jashtë shpat line, pastaj me trekëndësh shtytje Board paralele të qasjes, linjë celular shpat, në mënyrë të përsëritur të përpiqet shpat,
正在翻譯中..