- Lighting and air conditioning inspection 8:00 am - 8:20 am - 1 CNC Fan Cleaning 8:30am-10:00am - Install key cabinet power cord 10:10am-10:25am - Install new injection room power cord 10:25am-10:35pm - Dismantling FG11 side pipe 10:30-110:00 - Fix 10:40am-10:50pm - Uninstall power plug FG11 side rack 11:00am-12:00pm - Repair K.K. Krismon table 13:00-13:100 - Lift from the afit.4 1st Floor 13:00-13:50 - Fosfest Sink 1 1:50pm - Wiring , Rear Door Of Plastic Injection Molding 14:10-14:45 - Steel Cut behind the side door of the injection room 14:45-15:10 - Install drinking water pipe Drinking Water Dispenser Line 14:50-15:25 - Installation of Cable Cabinet 15:25 -16:10 - Deck cleaning 16:15-17:10 - Repair the air conditioning room Grip tec 17:15-17:50 - Install the lighting control system F1 all 4 points 17:50-18:10 - Repair air conditioning restaurant 3rd floor 18:15-18:35 - Change the female toilet hose on the 1st floor 18:40-19:00