Trucks are used for the haulage of ore to the processing facilities (crushing, milling, and floatation). Overburden is dumped on waste dumps and and into the old open pit. Tailings are deposited into the Veliki Krivelj tailing pond. The locations of these mining facilities are shown on Figure 2 .