Note the hatch shouldapply for work permit lifting, hanging personnel with knapsack belt, hanging four weeks clearance and personnel control.Lifting the required time and manpower(a) Lifting time: expected to be completed within one day(b) Lifting handling manpower required: x 1 person supervision, industrial safety x 1 person, operator x 1 person,hanging directing hand x 1 person, porter x 4 people.