we have not received the permit from the Building Dept as of yet so we have not released the signage to production as of yet.
Please forward the 50% deposit so that we are ready to go as soon as permit it issued.
We will be able provide an estimated install date once the sign is in fabrication. If you need a temporary sign to open before the sign is ready we can supply a banner.
Thank you,