 With the left hand, grasp the hook-pile tape lowering line, palm fac的繁體中文翻譯

 With the left hand, grasp the hoo

 With the left hand, grasp the hook-pile tape lowering line, palm facing the JM. Pull up if the short bridal is attached horizontally, or to the jumper’s left if it is attached vertically. Insert the index finger and middle finger of the right hand, from the jumper’s left to right, behind the locking D-ring. Ensure that it is properly attached to the triangle link and is locked into place. Trace up the short bridal, ensuring it is not twisted, cut, or frayed, until contact is made with the girth hitch of the hook-pile-tape lowering line. Place the right index finger on the girth hitch, ensuring the cotton buffer is present. Place the index finger and middle finger of the right hand from the jumper’s left, to just behind the short bridal on the opposite side of the girth hitch. Trace the short bridal until contact is made with the triangle link, ensuring it is not twisted, cut, or frayed, paying special attention to the point of attachment at the triangle link. Leave the left hand in place and put the index finger of the right hand on the hook-pile tape lowering line where it emerges from the lowering line stow pocket. Ensure no excess of the hook- pile tape lowering line is protruding from the retainer flap. Trace the hook-pile tape lowering line until the index finger disappears behind the nylon chaff portion of the MAWC, ensuring it is not cut, frayed, or burned. Leave the right index finger in place and with the left hand grasp the trail edge of the MAWC and pull it toward the JM. Remove the right index finger and rotate it around to the backside of the MAWC and continue the inspection of the hook-pile tape lowering line where it emerges from the nylon chaffing. Trace the hook-pile tape lowering line to its point of attachment. With the thumb of the right hand, push in on the activating lever of the ejector snap to ensure it is properly seated over the ball detent. Ensure it is free of any foreign matter, and the opening gate is facing the jumper’s body. With the thumb and index finger of the right hand, pinch off the yellow safety lanyard and trace it until fingers fall off the end, ensuring it is not wired, tied, or taped. Move to the front of the jumper and issue the command, SQUAT.
0/5000
原始語言: -
目標語言: -
結果 (繁體中文) 1: [復制]
復制成功!
 With the left hand, grasp the hook-pile tape lowering line, palm facing the JM. Pull up if the short bridal is attached horizontally, or to the jumper’s left if it is attached vertically.<br> Insert the index finger and middle finger of the right hand, from the jumper’s left to right, behind the locking D-ring. Ensure that it is properly attached to the triangle link and is locked into place.<br> Trace up the short bridal, ensuring it is not twisted, cut, or frayed, until contact is made with the girth hitch of the hook-pile-tape lowering line.<br> Place the right index finger on the girth hitch, ensuring the cotton buffer is present.<br> Place the index finger and middle finger of the right hand from the jumper’s left, to just behind the short bridal on the opposite side of the girth hitch. Trace the short bridal until contact is made with the triangle link, ensuring it is not twisted, cut, or frayed, paying special attention to the point of attachment at the triangle link.<br> Leave the left hand in place and put the index finger of the right hand on the hook-pile tape lowering line where it emerges from the lowering line stow pocket. Ensure no excess of the hook- pile tape lowering line is protruding from the retainer flap. Trace the hook-pile tape lowering line until the index finger disappears behind the nylon chaff portion of the MAWC, ensuring it is not cut, frayed, or burned.<br> Leave the right index finger in place and with the left hand grasp the trail edge of the MAWC and pull it toward the JM. Remove the right index finger and rotate it around to the backside of the MAWC and continue the inspection of the hook-pile tape lowering line where it emerges from the nylon chaffing.<br> Trace the hook-pile tape lowering line to its point of attachment.<br> With the thumb of the right hand, push in on the activating lever of the ejector snap to ensure it is properly seated over the ball detent. Ensure it is free of any foreign matter, and the opening gate is facing the jumper’s body.<br> With the thumb and index finger of the right hand, pinch off the yellow safety lanyard and trace it until fingers fall off the end, ensuring it is not wired, tied, or taped.<br>移動到跳線的前面,發出命令,蹲下。
正在翻譯中..
結果 (繁體中文) 2:[復制]
復制成功!
• 用左手,抓住鉤樁膠帶降低線,手掌朝JM。如果短新娘水準連接,則向上拉;如果垂直連接,則向上拉。<br>• 將右手的食指和中指從跳線的左向右插入鎖定 D 環後面。確保它正確連接到三角形連結並鎖定到位。<br>• 追蹤短新娘,確保它不扭曲、切割或磨損,直到與鉤樁膠帶下降線的周長接觸。<br>• 將右食指放在周長上,確保存在棉緩衝液。<br>• 將右手的食指和中指從跳線的左側放置,放在周長搭車另一側的短新娘後面。跟蹤短新娘,直到與三角形連結接觸,確保它不扭曲、切割或磨損,特別注意三角形連結處的附著點。<br>• 將左手留在原位,將右手的食指放在鉤樁膠帶降低線上,從下線收起口袋。確保吊鉤樁下部沒有從固定器活門伸出。追蹤鉤樁膠帶降低線,直到食指消失在MAWC的尼龍屑部分後面,確保它不被切割、磨損或燒傷。<br>• 將右食指留在原位,用左手抓住 MAWC 的軌跡邊緣並將其拉向 JM。取下右食指並將其旋轉到 MAWC 的背面,並繼續檢查從尼龍摩擦中冒出的鉤樁膠帶降低線。<br>• 跟蹤鉤樁膠帶降低線到其連接點。<br>• 用右手的拇指,推入彈出器扣的啟動杆,以確保其正確安裝在球止動器上。確保它沒有任何異物,並且打開的門面向跳線體。<br>• 用右手的拇指和食指,捏掉黃色安全掛繩並跟蹤它,直到手指從末端脫落,確保它不連接、綁住或綁住。<br>• 移動到跳線的前面,併發出命令,SQUAT。
正在翻譯中..
結果 (繁體中文) 3:[復制]
復制成功!
用左手抓住鉤樁膠帶下降線,手掌面向JM。如果短新娘是水准連接的,請向上拉;如果是垂直連接的,請向左拉。<br>將右手食指和中指從跳線的左至右插入鎖定的D形環後面。確保其正確連接到三角形連杆並鎖定到位。<br>l追跡短新娘,確保其沒有扭曲、切割或磨損,直到與鉤樁膠帶下降線的周長掛鉤接觸。<br>將右手食指放在圍帶掛鉤上,確保有棉花緩衝墊。<br>將右手食指和中指從跳高者的左手放在圍帶結對側的短新娘後面。跟踪短新娘,直到與三角形連杆接觸,確保它沒有扭曲、切割或磨損,特別注意三角形連杆處的連接點。<br>將左手放在適當位置,將右手食指放在鉤樁膠帶下降線上,從下降線儲物袋中露出。確保沒有過多的鉤樁膠帶下降線從固定襟翼突出。跟踪鉤樁膠帶下降線,直到食指消失在MAWC尼龍箔條部分後面,確保其未被切割、磨損或燒傷。<br>將右手食指放在適當位置,用左手抓住MAWC的尾緣,並將其拉向JM。拆下右食指並將其旋轉到MAWC的背面,繼續檢查從尼龍摩擦中露出的鉤樁膠帶下降線。<br>追跡鉤樁膠帶下降線至其連接點。<br>用右手大拇指壓入推料器卡扣的啟動杆,以確保其正確座合在球形止動器上。確保沒有任何异物,並且打開的門面向跳線的主體。<br>l用右手拇指和食指捏下黃色安全繩,並追跡至手指從末端脫落,確保沒有接線、捆綁或膠帶。<br>•移到跳投者的前面並發出命令,蹲下。<br>
正在翻譯中..
 
其它語言
本翻譯工具支援: 世界語, 中文, 丹麥文, 亞塞拜然文, 亞美尼亞文, 伊博文, 俄文, 保加利亞文, 信德文, 偵測語言, 優魯巴文, 克林貢語, 克羅埃西亞文, 冰島文, 加泰羅尼亞文, 加里西亞文, 匈牙利文, 南非柯薩文, 南非祖魯文, 卡納達文, 印尼巽他文, 印尼文, 印度古哈拉地文, 印度文, 吉爾吉斯文, 哈薩克文, 喬治亞文, 土庫曼文, 土耳其文, 塔吉克文, 塞爾維亞文, 夏威夷文, 奇切瓦文, 威爾斯文, 孟加拉文, 宿霧文, 寮文, 尼泊爾文, 巴斯克文, 布爾文, 希伯來文, 希臘文, 帕施圖文, 庫德文, 弗利然文, 德文, 意第緒文, 愛沙尼亞文, 愛爾蘭文, 拉丁文, 拉脫維亞文, 挪威文, 捷克文, 斯洛伐克文, 斯洛維尼亞文, 斯瓦希里文, 旁遮普文, 日文, 歐利亞文 (奧里雅文), 毛利文, 法文, 波士尼亞文, 波斯文, 波蘭文, 泰文, 泰盧固文, 泰米爾文, 海地克里奧文, 烏克蘭文, 烏爾都文, 烏茲別克文, 爪哇文, 瑞典文, 瑟索托文, 白俄羅斯文, 盧安達文, 盧森堡文, 科西嘉文, 立陶宛文, 索馬里文, 紹納文, 維吾爾文, 緬甸文, 繁體中文, 羅馬尼亞文, 義大利文, 芬蘭文, 苗文, 英文, 荷蘭文, 菲律賓文, 葡萄牙文, 蒙古文, 薩摩亞文, 蘇格蘭的蓋爾文, 西班牙文, 豪沙文, 越南文, 錫蘭文, 阿姆哈拉文, 阿拉伯文, 阿爾巴尼亞文, 韃靼文, 韓文, 馬來文, 馬其頓文, 馬拉加斯文, 馬拉地文, 馬拉雅拉姆文, 馬耳他文, 高棉文, 等語言的翻譯.

Copyright ©2024 I Love Translation. All reserved.

E-mail: