ite shall begin steaming out. When steam appears at the vents, and the equipment metal skin temperature arise to about 95-100°C, Zyme-Flow® injection will begin. The Vapour-Phase® decontamination will take approximately twelve (12) hours with Zyme-Flow® injection and one (1) or two (2) additional hours with just steam.