3.8 The Parties shall participate in a defect inspection of the Premises with MVOW and the building engineer(s) and contractor(s), on or before the Contractor’s handover meeting with MVOW prior to the Term Commencement (as defined in the MVOW Lease Agreement) in accordance with the time schedule. At such defect inspection, the Parties, MVOW the building engineer(s) and contractor(s) will jointly inspect the Premises, including the Factory, to find any lack of conformity with the Contractor’s handover obligations and the Lessee’s Requirements. The Contractor shall prepare a list of defects to be sent to the Employer for approval. Upon the Contractor’s receipt of the Employer’s acceptance of such list of defects, the Contractor shall (at its costs) remedy the defects found as soon as possible and subject to Appendix 3.4 (Construction Milestones and Liquidated Damages).