Rough and the anchor will be evaluated in the sample.
If any problem, but the ASE should stop the 2nd order.
It is the order in ASE side is controlled.
Therefore, it will not make 2nd order.
In the case making 2nd order
It will VDA are also changed in the spec change
if no problem, no need change VDA .
Why, we can not understand how to add the 1Lot only.