(1) along the drainage should be designed according to the road grade, topography, geology, bridge and culvert locations considered, reasonable layout, and there is sufficient drainage capacity, improve treatment of outlet to make cohesion combined with the facilities to ensure smooth drainage.
(2) should tie in with construction planning, prevention of farmland washed away or harm farm irrigation facilities. When the subgrade occupied irrigation ditches, and should be restored, and to take the necessary measures for seepage.
(3) road through the villages and residential areas, drainage facilities shall coordinate with the existing water supply and drainage facilities and construction planning.
(4) water to local conditions, affordable, drainage ditches should choose the terrain and geology better lot through to save reinforcement project investments. Drainage outlet as far as possible to the natural stream, to reduce the bridge project.
(1) along the drainage should be designed according to the road grade, topography, geology, bridge and culvert locations considered, reasonable layout, and there is sufficient drainage capacity, improve treatment of outlet to make cohesion combined with the facilities to ensure smooth drainage.
(2) should tie in with construction planning, prevention of farmland washed away or harm farm irrigation facilities. When the subgrade occupied irrigation ditches, and should be restored, and to take the necessary measures for seepage.
(3) road through the villages and residential areas, drainage facilities shall coordinate with the existing water supply and drainage facilities and construction planning.
(4) water to local conditions, affordable, drainage ditches should choose the terrain and geology better lot through to save reinforcement project investments. Drainage outlet as far as possible to the natural stream, to reduce the bridge project.
正在翻譯中..
