Supporting arrangement for radiator Supplier to confirm that the supporting arrangement (except foundation) for all radiator and its fans is in supplier scope of supply.Busduct termination flange Supplier to please note that size of the flange used for the busduct termination at the transformer end shall be decided during detail engineering stage. Same shall be supplied by the supplier during detail engineering stage without any cost and time impact.Busduct termination Supplier to submit past executed project data with PDO for the transformer connected with the MV Air pressurized Isolated phase busduct alongwith the bid.Bushing insulators "Supplier to note that the creepage distance shall be achieved for the maximum system voltage considering 40 mm/kV.Accordingly insulator shall be selected.Supplier to confirm."Fan control cabinet & marshalling cabinet "Supplier to please note that the Fan control cabinet and Marshalling cabinet shall be mounted on the transformer body with suitable supports.Supplier to confirm."Cooling air fan "Supplier to please provide the details about the cooling fans such as voltage, rating, etc and cooling fans shall be suitable 3 phase supply. Supplier to also note that single point supply will be made available for all the cooling fans and further distribution is in supplier scope of supply.Supplier to confirm."GA drawing of RTCC panel "General arrangement drawing with heat loss of the RTCC panel shall be provided with the offer.Supplier to submit the same with the dimension."Tap change details Supplier to please provide the details about the TAP changer i.e. voltage class, rating etc.