Traffic Construction – heavy equipment to build lease
Rig move - in and out (20-30 loads of semi-sized truck traffic.)
Daily operations – Light truck/car traffic, also a water truck and a vacuum truck.
Flaring DST (drill stem test) may be required. Flaring will be minimal.
Odours No odours are anticipated.
Emissions Diesel electric power generation, Heavy-duty diesel vehicles and normal light duty gasoline vehicles.
Noise During drilling the rig will have motors running 24 hrs per day. We will adhere to AERCB Guide 38 – noise control directive.