1.Time of delivery:50 days after receipt of advance payment of 30% of total sum.
2. Term of Payment: 30% of total sum, as advance payment shall be paid by T/T, 70% of total sum shall be paid before shipment by T/T.
3. Installation: If the buyer requires the seller send the engineer to guide to install the machine, take trial run, the buyer should prepare the materials needed. The actual expenses incurred for accommodation, to and fro travel for the engineer, insurance, and labor charge should be borne by the buyer. The labor charge for the engineer is US$50 per day
4. Warranty: 100% brand new when leaving the factory. The seller guarantee quality of the machines for a period of one year from the date of trial run finish, but not to exceed thirteen months from date on which machines away to the delivery port. If any parts (excluding easily damaging parts) are found defective in quality in the first year, the seller should replace free-of-cost. After one year, parts can be replaced on favorable payment basis.