Vibration experiment was done for all 11W products by vibratory conveyer after pull out cap, the vibratory frequency is 100%, and
vibratory time is 30min. No failure was found after the vibratory test.
f. Recheck the glue record and baking record, the records are within the specification of work instruction.
c. The long action is change base fixture to make sure cap and ceramic could combine well. The improved base fixture is expected
to be completed at the middle of Aug.
b. Adding fulling check the cap dropped failure in optical checking process by pulling the both ends of caps.
certificate certificate
After improvement:Using steel rule
to press the cap to combine the
ceramic closely before covering the
Covering the