1. MATERIAL / JOB DESCRIPTION
LF Station No. 20654321 Steelworks water-cooled hood and one each from the project to be done in accordance with the technical specifications in addition to the manufacture of water-cooled hood shown in the project No. 20678864.
2. USE AND WORKING CONDITIONS
Water-cooled hoods, during the processing of the liquid steel in the ladle into the pot by closing the station via open gathering of dust and gas serves to be sent to the dust collection unit.
3. TECHNICAL SPECIFICATIONS and REQUIREMENTS:
a) 20654321 and No. 20678864 of the water-cooled hoods manufacturing is only shown in the project include the following exposures:
1) Water Cooled hood body; POS-1 (hydraulic piston mounting plate is included.)
2) Dust suction channel; POS-3
3) Surveillance caps; POS and POS-4-5 (according to the revised project will be held in the Appendix)
4) Hood fixing plate; POS-6
5) Wire Making groove; POS-8 (20654328 No. according to the project)
6) Material gutter; POS-9 (36.01.AI.01.00.001.0 and will be manufactured according to the project No. 36.01.AI.01.00.002.0)
b) After manufacturing chemical washing operation will be appended by the chemical cleaning procedure.
c) Material Gutter (POS-9) are matters to be considered in manufacturing;
1) Water-cooled materials and groove in 36.01.AI.01.00.001.0 36.01.AI.01.00.002.0 numbered project will be manufactured in accordance with the specified dimensions and tolerances.
2) After-welded joints, the joints of the panel, pose with the pose-2-one
and b branded source surface to the inner surface 2 mm thick hard coating
It will be made.
3) The groove in the elbow in the forehead towards the outer surface of 100 mm. the coating will be done.
Hard coating:
Material: Technogénia TP 4000 (60% Ni-Cr-B-Si base + 40% WC-2c) or equivalent
Coating Method: Flame Spray Powder Application
Average Surface Hardness: 120 HRC
d) Hoods water inlet and outlet pipes will be made to the collector inlet shown in the Project No. 20654321 and 20678864.
e) After the chemical cleaning process for water-cooled hood 1 bar nitrogen gas pipe will be printed pipe mouths closed.
f) The pipes to be used in production comply with the standards specified in the project and not exposed to corrosion effect will be waiting in the stock pipes.
g) the Manufacturer references related to similar manufacturing, manufacturing qualification certificate will be given to proposals with the capacity report.
h) to be used during the manufacturing tolerances will comply with 200 standards in addition to the SNA.
4. METHOD OF TESTING, TESTING PROCEDURES and will REPORTS PREPARED:
a) after the manufacturing hood 6 bar will be subjected to hydraulic testing. The delivery of the material test report will be presented to us.
b) The material certificates of pipes used in production will be delivered to İSDEMİR.
c) Pipe resources by controlling the destructive method results will be presented to us.
d) After making control of cracks in pipes in pipe bends results will be reported.
e) results of checks carried dimensional measure will be presented to us.
f) The Company will provide test certificates for the welders to run the offer of crops.
g) Resource procedure with diplomas controls the organization and the results will be reported. (WPQR (WPS / PQR), DIN EN 288-3)
5. ADMISSION REQUIREMENTS (STRICT, TRANSITIONAL AND ACCEPTANCE OF TERMS OF RED)
a) adoption of measurement controls made after the delivery of the material will be made.
b) to arrange the adoption of manufacturing firms will submit complete documents requested.
6. WARRANTY: After Water Cooled hoods circuit against material and workmanship will be under 1 year manufacturer warranty.
0/5000
原始語言: -
目標語言: -
結果 (中文) 1: [復制]
復制成功!
1.材料 / 职位描述LF 站号 20654321 钢厂水冷罩和一个每个从项目,须符合技术规格除了制造的水冷发动机罩,项目号 20678864 中所示。2.使用和工作条件水冷头罩,钢包内钢液倒入锅中闭幕通过开放收集的尘埃和气体站服务发送到灰尘收集器的加工过程。3.技术规格和要求:a) 20654321 和号 20678864 制造仅显示项目中的水冷头罩包括下列风险:1) 水冷却罩体;POS 1 (安装板的液压活塞是包括在内)。2) 粉尘吸入通道;POS 33) 监视帽;POS 和 POS-4-5 (根据修订后的计划将举行在附录中)4) 防护罩固定板;POS 65) 丝制作槽内;POS 8 (20654328 号根据该项目)6) 材料装订线;POS 9 (36.01.AI.01.00.001.0 和将制造项目号 36.01.AI.01.00.002.0)b) 在制造化学清洗后将由化学清洗过程附加操作。c) 材料装订线 (POS-9) 是在制造; 考虑事项1) 水冷材料和槽在 36.01.AI.01.00.001.0 36.01.AI.01.00.002.0 编号的项目将会按照指定的尺寸和公差制造。2) After-welded joints, the joints of the panel, pose with the pose-2-oneand b branded source surface to the inner surface 2 mm thick hard coatingIt will be made.3) The groove in the elbow in the forehead towards the outer surface of 100 mm. the coating will be done.Hard coating:Material: Technogénia TP 4000 (60% Ni-Cr-B-Si base + 40% WC-2c) or equivalentCoating Method: Flame Spray Powder ApplicationAverage Surface Hardness: 120 HRCd) Hoods water inlet and outlet pipes will be made to the collector inlet shown in the Project No. 20654321 and 20678864.e) After the chemical cleaning process for water-cooled hood 1 bar nitrogen gas pipe will be printed pipe mouths closed.f) The pipes to be used in production comply with the standards specified in the project and not exposed to corrosion effect will be waiting in the stock pipes.g) the Manufacturer references related to similar manufacturing, manufacturing qualification certificate will be given to proposals with the capacity report.h) to be used during the manufacturing tolerances will comply with 200 standards in addition to the SNA.4. METHOD OF TESTING, TESTING PROCEDURES and will REPORTS PREPARED:a) after the manufacturing hood 6 bar will be subjected to hydraulic testing. The delivery of the material test report will be presented to us.b) The material certificates of pipes used in production will be delivered to İSDEMİR.c) Pipe resources by controlling the destructive method results will be presented to us.d) 后使裂缝的控制管道在管道中的折弯结果将报告。e) 检查进行三维测量的结果将提交给我们。f) 公司将提供测试证书的焊工要运行提供的作物。g) 资源过程与文凭控制组织,并将报告结果。(材料 (WPS / PQR),DIN EN 288-3)5.入学要求 (严格、 过渡和接受条款的红)a) 通过测量控件将提供的材料后作出。b) 安排的制造业公司通过将提交要求的完整文件。6.保证: 水冷却后罩电路对材料和工艺方面将会下 1 年制造商保修。
正在翻譯中..
結果 (中文) 3:[復制]
復制成功!
1。材料/工作描述
LF站第20654321钢厂水冷罩和每一个项目要按照技术规格中除了制造水冷兜帽显示项目号20678864。
2。使用和工作条件
水冷烟罩,在钢包中钢水的处理过程中,通过关闭该站,通过开收尘和气体的方法,将其送至除尘装置。技术规格及要求:
一)20654321和20678864号水冷罩制造只显示在项目包括以下风险:1)
水冷罩体;pos-1(液压活塞安装板是包括。)
2)吸尘通道;pos-3
3)监测帽;POS和pos-4-5(按修订后的项目将被关押在附录)
4)罩固定板;pos-6
5)线槽;pos-8(第20654328根据项目)
6)材料沟;pos-9(36.01。AI。01.00.001.0将根据制造项目号36.01.ai.01。00.002.0
B)制造化学清洗操作后将被添加的化学清洗程序。
C)材料槽(pos-9)是问题被认为是在制造;
1)水冷却材料和槽36.01。AI。01.00.001.0 36.01。AI。01.00.002.0编号项目将制造按照指定的尺寸和公差。
2)后焊接接头,的接头的面板,构成与pose-2-one
和B品牌源表面的内表面2毫米厚的硬涂层
它会做。
3)槽肘部在额头向100 mm的外表面。涂层将完成。
硬涂层:
材料:technogéNIA TP 4000(60%试验基地40% wc-2c)或等效
涂层方法:粉末火焰喷涂的应用
平均表面硬度:120 HRC
d)罩进水管和出水管将是收集器的进口所示项目编号20654321 20678864。
E)水冷兜帽1 bar氮气管道的化学清洗工艺后将被印刷管口封闭。
F)管是用于生产符合标准规定的项目和不暴露于腐蚀效应将等待的股票管。
G)制造商参考相关类似制造,制造资格证书将被给予建议报告的能力。
h)是在制造公差符合200标准除了SNA
4。方法测试,测试程序,并将编写的报告,在制造引擎盖6栏将进行液压测试。材料测试报告将提交给我们。b)生产中使用的管道材料证书将被送到İSDEMİR
C)管资源的控制破坏性方法的结果将提交给我们。D
)后控制裂纹管道弯管结果将报告。
E)的检查结果进行尺寸测量将被呈现给我们。
f)公司将提供运行作物提供焊工证书。
G)与文凭资源控制程序,组织将报告结果。(WPQR(WPS和PQR),DIN EN 288-3)
5。入学要求(严格的,过渡性的和接受的条款)的红色),通过测量控制后的材料交付使用。乙)安排通过制造业公司将提交完整的文件要求。保修:在水冷罩电路对材料和工艺将1年制造商保修。
正在翻譯中..
 
其它語言
本翻譯工具支援: 世界語, 中文, 丹麥文, 亞塞拜然文, 亞美尼亞文, 伊博文, 俄文, 保加利亞文, 信德文, 偵測語言, 優魯巴文, 克林貢語, 克羅埃西亞文, 冰島文, 加泰羅尼亞文, 加里西亞文, 匈牙利文, 南非柯薩文, 南非祖魯文, 卡納達文, 印尼巽他文, 印尼文, 印度古哈拉地文, 印度文, 吉爾吉斯文, 哈薩克文, 喬治亞文, 土庫曼文, 土耳其文, 塔吉克文, 塞爾維亞文, 夏威夷文, 奇切瓦文, 威爾斯文, 孟加拉文, 宿霧文, 寮文, 尼泊爾文, 巴斯克文, 布爾文, 希伯來文, 希臘文, 帕施圖文, 庫德文, 弗利然文, 德文, 意第緒文, 愛沙尼亞文, 愛爾蘭文, 拉丁文, 拉脫維亞文, 挪威文, 捷克文, 斯洛伐克文, 斯洛維尼亞文, 斯瓦希里文, 旁遮普文, 日文, 歐利亞文 (奧里雅文), 毛利文, 法文, 波士尼亞文, 波斯文, 波蘭文, 泰文, 泰盧固文, 泰米爾文, 海地克里奧文, 烏克蘭文, 烏爾都文, 烏茲別克文, 爪哇文, 瑞典文, 瑟索托文, 白俄羅斯文, 盧安達文, 盧森堡文, 科西嘉文, 立陶宛文, 索馬里文, 紹納文, 維吾爾文, 緬甸文, 繁體中文, 羅馬尼亞文, 義大利文, 芬蘭文, 苗文, 英文, 荷蘭文, 菲律賓文, 葡萄牙文, 蒙古文, 薩摩亞文, 蘇格蘭的蓋爾文, 西班牙文, 豪沙文, 越南文, 錫蘭文, 阿姆哈拉文, 阿拉伯文, 阿爾巴尼亞文, 韃靼文, 韓文, 馬來文, 馬其頓文, 馬拉加斯文, 馬拉地文, 馬拉雅拉姆文, 馬耳他文, 高棉文, 等語言的翻譯.