As the developer of the technology URT should complete their analysis of the remaining six paddocks of data where there are better understood multiple lines of lode. This should be at their own cost and not at proposed commercial rates since it is their technology which is being tested. If the technology fails the correlation test the balance of the unused deposit should be returned.