Plot line and mark the height of pile in, confirm the position of the pile in. Information collection and become familiar with the specifications.
(2) where the callout control points
Locus of control refers to the influence of road longitudinal slope design of elevation points. Such as route, destination, key bridges and culverts, adverse geological sections of the minimum fill, maximum digging depth, main buildings along the roads, intersections and other factors limit the elevation of the road through the control points, and so on.
(3) test
Try slope mainly in the already marked "control points" Profile based on the intentions of technical indicators and line selection, combined with the up and down, in a "control point" basis, taking into account the majority of "economic" principle, in interludes between those points and cut-off straightened, try to set aside a certain straight slope line. To compare all possible straight line again, elect conforms to the technical standards, and meet point requirements and early earthwork design lines in the province as straight lines, straight slope line extension, set the initial position of grade change.
(4) adjustments
After the trial, will be set by the longitudinal line longitudinal to consider when comparing both should meet. If there is a difference, it should conduct a comprehensive analysis to find out the causes, checked against the specification and design of maximum longitudinal slope, slope gradient and slope length of synthesis and so on whether met regulatory requirements, coordination of horizontal alignment and vertical alignment the desirability and so on.
(5) check
According to the adjusted straight slope line, select the cross section of key controls, such as the high fill retaining wall in deep excavation, and an important bridge and culvert sections, read out the corresponding directly to the Profile in the piles of fill (dig) height and check for cut and fill, slope foot fall to the ground or retaining the.
(6)
After adjustment check that can be set. Are piecewise straight lines of slope gradient, grade change point position (number) and elevations determined. General to adjust the grade change point to 5M or 10m on the whole, change of elevation based on longitudinal slopes, slope lengths in turn calculated to determine.
(7) the longitudinal design results as shown in table 1
0/5000
原始語言: -
目標語言: -
結果 (阿爾巴尼亞文) 1: [復制]
復制成功!
(1) a hard time preparations
Plot line and mark the height of pile in, confirm the position of the pile in. Information collection and become familiar with the specifications.
(2) where the callout control points
Locus of control refers to the influence of road longitudinal slope design of elevation points. Such as route, destination, key bridges and culverts, adverse geological sections of the minimum fill, maximum digging depth, main buildings along the roads, intersections and other factors limit the elevation of the road through the control points, and so on.
(3) test
Try slope mainly in the already marked "control points" Profile based on the intentions of technical indicators and line selection, combined with the up and down, in a "control point" basis, taking into account the majority of "economic" principle, in interludes between those points and cut-off straightened, try to set aside a certain straight slope line. To compare all possible straight line again, elect conforms to the technical standards, and meet point requirements and early earthwork design lines in the province as straight lines, straight slope line extension, set the initial position of grade change.
(4) adjustments
After the trial, will be set by the longitudinal line longitudinal to consider when comparing both should meet. If there is a difference, it should conduct a comprehensive analysis to find out the causes, checked against the specification and design of maximum longitudinal slope, slope gradient and slope length of synthesis and so on whether met regulatory requirements, coordination of horizontal alignment and vertical alignment the desirability and so on.
(5) check
According to the adjusted straight slope line, select the cross section of key controls, such as the high fill retaining wall in deep excavation, and an important bridge and culvert sections, read out the corresponding directly to the Profile in the piles of fill (dig) height and check for cut and fill, slope foot fall to the ground or retaining the.
(6)
After adjustment check that can be set. Are piecewise straight lines of slope gradient, grade change point position (number) and elevations determined. General to adjust the grade change point to 5M or 10m on the whole, change of elevation based on longitudinal slopes, slope lengths in turn calculated to determine.
(7) the longitudinal design results as shown in table 1
正在翻譯中..
 
其它語言
本翻譯工具支援: 世界語, 中文, 丹麥文, 亞塞拜然文, 亞美尼亞文, 伊博文, 俄文, 保加利亞文, 信德文, 偵測語言, 優魯巴文, 克林貢語, 克羅埃西亞文, 冰島文, 加泰羅尼亞文, 加里西亞文, 匈牙利文, 南非柯薩文, 南非祖魯文, 卡納達文, 印尼巽他文, 印尼文, 印度古哈拉地文, 印度文, 吉爾吉斯文, 哈薩克文, 喬治亞文, 土庫曼文, 土耳其文, 塔吉克文, 塞爾維亞文, 夏威夷文, 奇切瓦文, 威爾斯文, 孟加拉文, 宿霧文, 寮文, 尼泊爾文, 巴斯克文, 布爾文, 希伯來文, 希臘文, 帕施圖文, 庫德文, 弗利然文, 德文, 意第緒文, 愛沙尼亞文, 愛爾蘭文, 拉丁文, 拉脫維亞文, 挪威文, 捷克文, 斯洛伐克文, 斯洛維尼亞文, 斯瓦希里文, 旁遮普文, 日文, 歐利亞文 (奧里雅文), 毛利文, 法文, 波士尼亞文, 波斯文, 波蘭文, 泰文, 泰盧固文, 泰米爾文, 海地克里奧文, 烏克蘭文, 烏爾都文, 烏茲別克文, 爪哇文, 瑞典文, 瑟索托文, 白俄羅斯文, 盧安達文, 盧森堡文, 科西嘉文, 立陶宛文, 索馬里文, 紹納文, 維吾爾文, 緬甸文, 繁體中文, 羅馬尼亞文, 義大利文, 芬蘭文, 苗文, 英文, 荷蘭文, 菲律賓文, 葡萄牙文, 蒙古文, 薩摩亞文, 蘇格蘭的蓋爾文, 西班牙文, 豪沙文, 越南文, 錫蘭文, 阿姆哈拉文, 阿拉伯文, 阿爾巴尼亞文, 韃靼文, 韓文, 馬來文, 馬其頓文, 馬拉加斯文, 馬拉地文, 馬拉雅拉姆文, 馬耳他文, 高棉文, 等語言的翻譯.