The traditional method, using two-stage tendering or negotiated tendering, is sometimes
referred to as the ‘Accelerated Traditional Method’ – this is where the design and
construction can run in parallel to a limited extent. Whilst this allows an early start on site, it
also entails less certainty about cost.