Kaybob South Beaver Hill Lake Unit 1
The Unit consists of a proximately 16 producing sour gas wells. The Unit wells produce
to the Kaybob Amalgamated (“KA”) gas plant located at 1F-12-62-20W5M through
approximately 110 kilometers of pipeline. A compressor and 3 phase separator located
in the southern part of the unit located at 7-30-61-19W5M compresses sour gas from
the unit wells located in TWP 61 RG 19 W5. Condensate and produced water are re-
injected into the gas pipeline and carried to the KA plant where the Unit owns two Solar
Turbine inlet compressors that further compress the gas to process pressure. High
pressure lift gas is pipeline from the KA plant to the Unit wells where it is used by some
of the wells as lift gas