Water or drainage digging out silt, and ground excavation into a step-like, step width ≥ 1.0M, internal 3% and 5% dust to backfill the original water (elevation control by 1.0M), bottom 30cm 5% of subgrade lime soil treatment, road-top 0~80cm 7% lime treatment.