6 Operating procedures
1. Land reclamation takes 30-45 days .
2. Concrete roads high 15 cm. wide 12 meters, long 620 meters, pipe takes 20-30 days.
3. Plumbing * Electrical takes 30-45 days.
*** Period of 90-120 days to complete the space.
Sales Plan – Marketing Plan
1. A large sign in front of the project 1-5 signed.
2. A small sign follow the road 2,000 sign.
3. Brochures sizes A4 5,000 sheets
***Social network, online, facebook, website etc