Three producing wells which flow into Bonavista system via LRE pipeline from 06-18-
058-13W5 to 05-11-58-14W4 and Taqa North compressor station at 05-11. Once in the
Bonavista system gas is either diverted to 16-12-056-14W5 Hattonford plant (TCPL
connected) or as it currently flows to SW Resources 14-26-059-16W6 West Windfall
Plant (Alliance connected).
Equipment at the wells is:
16-08-58-13W5, 3 phase separator, 400 bbl tank and EFM SI
12-03-58-13W5, 3 phase separator, 400 bbl tank and EFM
06-08-58-13W5, 3 phase separator, 400 bbl tank, EFM and 90 hp Cummins Srew
compressor.)