2. With the water level at –20mm, the top of the “Skimmer” walls (structural surface, 3-sides, without gutter, before tiling) is at +130mm. The flat surface for the gutter installation is at –250mm. This means the difference between the top of the higher walls (3-sides) are 130+250=380mm. Please see GL-02 and check the site situation for me.