9-148. Prior to inspecting the jumper, the jumpmaster moves behind the jumper and opens the main curved pin protector flap. The JM next disconnects the universal static line snap hook from the outer static line stow bar, insuring that the spring opening gate has spring tension. The jumpmaster removes all excess static line from the static line slack retainer band, and routes the universal static line modified over the shoulder corresponding with the door that the jumper is to exit.9-149. The jumpmaster secures the universal static line snap hook to the carrying handle of the MC-7 reserve parachute, with the spring opening gate facing towards the jumper. Finally, the JM removes the top and bottom tuck tabs on the reserve, taking care to ensure that both side tuck tabs remain secure. If the canopy release assembly cover plate is activated or the side tuck tabs become unsecured, the jumpmaster notifies a rigger. The jumpmaster may now begin the inspection. After the jumpmaster has completed the JMPI, these components will be placed back into jump configuration.