To fast the schedule of site preparation, 4 containers furnished air-conditioners would be set up at the appointed location. They will be taken as site offices and site warehouses. Electric power will be supplied by generators and a backup generator 100kW will be prepared.
The staff will lived in local house out of the plant area. Material storage area and manufacture shop will be set in near site offices.