) Turn on the machine power button.
2) Check the compressed air 6 bar or above.
3) Load the insulator tape, cross tape and collector tape materials.
4) Press the cycle start button and load the panel to this station.
5) After this process unload the panel from the conveyor.
ii) SOP for back box load & solder station process:
1) Turn on the machine power button.
2) Check the compressed air 6 bar or above.
3) Load the back box & VHB materials on the relevant place.
4) Press the cycle start button and load the panel.
5) After this process panel will transfer to the next station.
iii) SOP for potting & UV curing process:
1) Turn on the machine power button.
2) Check the compressed air 6 bar or above.
3) Press the cycle start button and the panel will come from previous station.
4) Apply the potting material when panel reach the buffer station.
5) Turn on the UV lamp should be in ready mode.
5) After this process panel will transfer to the next station.
iv) SOP for hipot & hipot dry process:
1) Turn on the machine power button.
2) Check the compressed air 6 bar or above.
3) Check the hipot tank whether having water or not.
4) Press the cycle start button and panel will come from previous station.
5) Hipot test plate will continue for lid load else will go to unload area.
v) SOP for lid load & tape apply process:
1) Turn on the machine power button.
2) Check the compressed air 6 bar or above.
3) Press the cycle start button and the panel will come from previous station.
4) Load the cover of the back box material & the tape material in the unit.
5) If any error occurs check the relevant component status from the field.
6) These process is not necessary by auto mode, can do the lid load by manually too.
7) Unload the panel from the unloading conveyor.