1.05 Time required to deal with construction permitsTotal number of days required to deal with procedures necessary to build a warehouse | 2018This indicator measures the median duration (in number of days) that local experts indicate is necessary in practice for a business to build a warehouse. The duration takes into account the following procedures: obtaining and submitting all relevant project-specific documents (for example, building plans, site maps and certificates of urbanism) tothe authorities; hiring external third-party supervisors, engineers or inspectors; obtaining all necessary clearances, licenses, permits and certificates; submitting all required notifications; and requesting and receiving all necessary inspections as well as all procedures for obtaining connections for water and sewerage. For further details, visit http://www. doingbusiness.org/en/methodology.Source: World Bank, Doing Business 2019: Training for Reform.