After the prefeasibility studies based on weather data (e.g. wind
speed, solar irradiation and temperature) and load demand the
selection of proper sizing of equipment can be made.But this sizing
process must be according to nature of PV and wind,e.g.if the study
location have good solar potential than wind then the hybrid system
must be configured with maximum share of PV system and minimum
share of wind system.