For volume expectations, please reference the existing FATMAX HPP range. If you need volumes we can provide them in a formal MNA but use this as a starting point. In the meantime I will work on getting an MNA loaded into Product Center by COB Monday.
For target launch dates, we want to be aggressive but at the same time want the plant and engineering to sign up for a date that they’re comfortable with. Can we target 1 month after DEWALT (2/15 for the S,L,R snips) or is that too aggressive? We’ll need Wendeng to provide a transition plan so we’re not stranded with any existing FATMAX components.